• 4/6/2020

    Posted by Alexis Mallory on 4/6/2020

    For Activity 3.2.3, please use Google Classroom and the 3 ppt's that I have linked on

    how to complete this activity.  You will need extra paper and keep your pencil sharp,

    an eraser and  a calculator.  Keep you engineer formula sheet open to refer to and when

    you are done, send me a picture of your work.  I will repsond as best I can so you can

    understand where there is a problem, if there is a problem.  I have this due for Friday.

    I do want you to do it completely as I have laid out in the PPT's.  Don't cheat yourself

    and half do it- do it completely, it will be worth it in the end.

    Comments (-1)
  • 4/1/2020

    Posted by Alexis Mallory on 4/1/2020

    Today I wouldlike you to complete the Snow load activity in Google Classroom

    I will try to explain how to use the tables later in the day which are in snow load resources.

    please read it carefully and answer all the questions

    For those that did not complete the work on Monday - do that first.

    I will begin making videos after the snow load to explain the work - so stay tuned.

     

    Comments (-1)
  • 3/30/2020

    Posted by Alexis Mallory on 3/30/2020

    Hello Everyone,

    There are two assignment that will be due at the end of the day today 3/30

    You need to complete both the Intro to Structures and the Loads and Load Paths.

    Please make certain you share them or send them to me.

    These are both introductory and need to be done well for the next assignment which

    I will be linking by Wed.  I will be making videos and if I feel it necessary, I will create some

    type of zoom meeting where we can talk face to face. 

    I will be at my computer 12:00p.m. - 1:00 p.m. MWF and 4:00 p.m. - 5:00p.m. T Th for questions

    but can always be reached via e-mail.  If you feel you need one on one we can come up with an alternative

    meeting situation so that I can help you.

     

    Comments (-1)
  • 3/22/2020

    Posted by Alexis Mallory on 3/22/2020

    Hello Everyone,

    For those that turned in the Intro to Structural Design Activities. I thank you for first reading my

    webpage and 2nd for completing the activities.

    It is important for everyone to get this done by Monday of next week.   I will be linking the next

    activity which will go a little more in depth about beams, theri loads and reaction forces.

    Our next project will be drawing by hand or using a web-based program that everyone can access

    If you have access to Revit or can get it let me know, it is a free download from Autodesk- see my link on my welcome page.

    So as we continue into week 2, we need to stay focused and work the best we can. 

    If you do not have access to internet either via your phone or computer

    please let me know or if you know of someone that is not getting this information, please let me know.

    So as of today- no new work however please send something out in your group chats, etc. to you friends and peers

    to let them know that they need to be checking my webpage and have the assignment completed for next Monday.

    Check for the new powerpoint.

     

    Send me any photos of how you and yours are dealing with Covid-19- what have you been doing, how are you keeping healthy.

     

    Comments (-1)
  • 3/16/2020

    Posted by Alexis Mallory on 3/16/2020

    Dear CEA Class,  It seems as if we are using snow days for this week 
                                and our spring break will be next week.  I posted a lesson
                                on Intro to Structural Design - 1 thing: worksheet
                                This assignment will not technically be due
                                until after our 2 weeks off.  For those that I have recieved, I will grade them
                                and get them in the grade book.  If those that did not turn them in yet
                                want to turn them in as you complete them- please do so.  
                                If I get word that we will be out for longer than the planned 2 weeks, I
                                will be posting more information on BEAMS so that we can get a head start
                                on this topic. I know you all must be bored and this will help expidite the 
                                learning process on this topic. 

                                 For now: stay healthy, wash you hands, stay away from crowds.
                                 Check periodically for updates.

    Comments (-1)
  • 3/16/2020

    Posted by Alexis Mallory on 3/16/2020

    Do Now/ Activity;

    Hello Everyone, We are going to try to get through content while we are away from school.

    It is very important that you check this web page every other day per our normal class time.

    If you know someone that has not checked or is not checking please reach out to them and tell

    that they need to do so.  All items needed to complete activities will be posted on google classroom.

    You will find what to do here and you will find the files necessary on the classroom.

    If in fact this contiues beyond 2 weeks we will attempt a project from home as well.

    So for today, the lesson will be Introduction to Structural Design. From there we will learn to calculate

    what size beam will be needed in the structure.  You will need to read the power points, watch any videos

    that I link and complete the Note worksheet and then completing the activities that I link. 

    So now you will go to Google Classroom and look at unit 3.2.1. 
    When you are done completing the handout and activity share
    it with 
    my by next class time.

    Comments (-1)
  • 3/12/2020

    Posted by Alexis Mallory on 3/12/2020

    Do Now: Take Quiz

    Activity:  Work on Jack and Diane House

    Comments (-1)
  • 3/10/2020

    Posted by Alexis Mallory on 3/10/2020

    Do Now/ Activity:  Work on Jack and Diane house

    Quiz on Thursday:

    4 handouts- commercial floor, walls and roof
              and land regulations which is the 2-25 do now

    Comments (-1)
  • 3/6/2020

    Posted by Alexis Mallory on 3/6/2020

    Do Now: Turn in commercial Roof System

    Activity:  Work on Jack and Diane House

    Complete Commercial Floor System for HW- find PPT on Google Classroom

    Comments (-1)
  • 3/4/2020

    Posted by Alexis Mallory on 3/4/2020

    Work on Jack and Diane House

    Complete Commercial Roofs for Homework- handout and PPT in Google Classroom

    Comments (-1)
Last Modified on Monday at 1:45 PM